img

Industrial crane maintenance, crane maintenance, industrial crane maintenance in Bursa

 Ensuring the healthy and long-term trouble-free operation of the cranes in your business, and using them economically and efficiently, is conditional on safety and security. To ensure this, periodic maintenance must be carried out regularly.

  1. Periodic maintenance is performed once every three months, making a total of four maintenances throughout the year.
  2. During each periodic maintenance, a periodic maintenance booklet is filled out, reported, and delivered to your business.
  3. In each periodic maintenance, all electrical and mechanical maintenance of the crane is performed.

In periodic maintenance, control main headings include:

  • Control of bridge travel gears
  • Control of trolley travel gears
  • Control of the bridge's electrical supply system
  • Control of the trolley's electrical supply system
  • Current value controls of bridge motors
  • Current value controls of trolley drive motors
  • Current value controls of the lifting motor
  • Control of limit switches
  • Rope control
  • Hook and hook block control
  • Control of reducers
  • Drum control
  • Crane control system control
  • Bridge travel path control
  • Trolley travel path control
  • Main girder and end beam connection bolt control
  • Platforms and railings
  • Warning labels
  • Overload control
  • Control of light and sound warnings and warning signs
  • Rope lubrication control
  • Oil level checks of reducers
Product Information / Request Form
If you want, you can send files in PDF, Word, Excel and Image formats.

|Back to Top